Projects

Former Jam Factory, Droylesden

Client: Bellway Homes.

Reserved Matters Planning Approval for 148 dwellings at the Former Jam Factory, Droylesden.

APD assisted with

THE PREPARATION OF

DESIGN AND ACCESS STATEMENT

PLANNING LAYOUT

TECHNICAL DRAWINGS INCLUDING MATERIALS AND HARD SURFACING PLANS

HOUSE TYPE AND CHARACTER ASSESSMENT

APD have assisted Bellway Homes in the preparation of a reserved matters planning application for 148 residential dwellings at the Former Jam Factory, Droylesden.

Throughout the application process, APD have prepared a number of drawings and documents, including;

  • Planning Layout
  • Technical Drawings, including; Boundary Treatments Plan, Hard Surfacing Plan and Materials Plan
  • Constraints Plan
  • 3D Imagery
  • Housetype Pack
  • Streetscenes
  • Design and Access Statement
Request A Callback